enlio sports floor indoor Gymnasium Flooring

Payment Type: L/C,T/T,Paypal,Money Gram,Western Union
Incoterm: FOB,CFR,CIF,EXW,FCA
Min. Order: 100 Square Meter
Delivery Time: 10 Days

Basic Info

Model No.: YL59145

Additional Info

Packaging: In roll Packing in canvas paper

Productivity: 30000 square meter per week

Brand: Enlio

Transportation: Ocean,Land,Air

Place of Origin: Hebei, China (Mainland)

Supply Ability: 500000 square meter per month

Certificate: SGS CE ISO9001 ISO14001 OHSAS18001

HS Code: 39181090

Port: Shanghai,TIANJIN,Qingdao

Product Description

Shijiazhuang Enlio Sports Goods Co.,LTD is situated in City of Shijiazhuang, Hebei Province, integrated with research & development, produce, sales, installation and after-sales service since 2007.

Enlio company has two brands of "Enlio" and "Alite", specialized is sports surfaces including PVC sports flooring, Modular Court Tiles , Wet Area Mats , Kids Room Flooring , Dance Flooring , Multi- Purpose Flooring, Coverts more than 100 types, applicable to Badminton Court Mat, table tennis court, basketball court, tennis court, volleyball court, gymnasium, dance room, kindergarten, swimming pool  surrounds hotels, etc.


Specifications

Gymnasium Flooring
1,Color-Red/Waterblue/Deep blue/Green/Orange/Gray
2.width-1.8m
3.length-unlimited
4.Usage-Gymnasium

Introduction 

width of single roll: 1.8m

length of roll unlimited

surface patterns: Gem

thickness of wear-resisting layer: 1.2mm

total thickness: 4.5mm

Color Red/Waterblue/Deep blue/Green/Orange/Gray

storage period: 6years

 sports flooring

The basic requirements:
1.The base for the pavement must be clean, dry, smooth and no cracks.
2.The concrete ground is supposed to have low moisture content less than 2.5% and the gypsum ground should be less than 0.5%.
3.Error of 2 meter ruler on floor surface should within 3mm.
Besides, wooden floor board, compound wood floor, tile floor, marble floor and terrazzo floor which could arrive the flatness requirement can also be paved.


 

Installation instruction:
The ground should be cleaned before installation, unfolded the floor tiles should be on the ground more than 24 hours in advance and the local temperature should not below 15°C. Leave 5cm more on each end when cutting.
1.Movable assemblage The pieces of flooring are cemented together with the special single-sided adhesive tape provided by the manufacturer, but the flooring in a whole would not adhere to the ground in order to facilitate the moving in the future.
2.Partial fasted cementation: Starting from the borderline of the flooring ,paint glue for cementation inward for 10cm.Or use the double-sided tape provided by the manufacturer for bonding.
3.Full-glue cementation: Cover the whole ground under the flooring with glue for cementation.(Basketball, tennis courts would be preferable to use the full-glue cementation, otherwise it will affect the rebound when the ball drop to the ground)


LIST OF RECOMMENDED SPORTS

+ Volleyball

+ Futsal

+ Handball

+ Hockey

+ Gymnastics

+ Fitness

+ Body building

+ Multisports

gym floor (14)gym floor (28)

Contact Information

CONTACT US

Shijiazhuang Enlio Sports Goods Co., Ltd.

Contact Person: Nina zhang

Phone:86-311-80732155

Fax:86-311-85296123

Address: Fangda Park, 10#404, Tianshan Street,Shijiazhuang,Hebei

Full name Contact Phone Content
点击刷新验证码